Draft: IT Asset Management NIST SP 1800-5 Practice Guide |
Executive Summary (485.21 KB)
Approach, Architecture, and Security Characteristics (1.03 MB)
How-To Guides (2.17 MB)
All Volumes (1.91 MB)
fs-itam-nist-sp1800-5-draft.zip (3.33 MB) |
October, 2015 |
Draft: Assessing Threats to Mobile Devices & Infrastructure NISTIR 8144 |
mtc-nistir-8144-draft.pdf (1.57 MB) |
September, 2015 |
Draft: Authentication for Law Enforcement Vehicle Systems |
psfr-alevs-project-description-draft.pdf (349.01 KB) |
September, 2015 |
Final: Software Asset Management Project Description |
sam-project-description-final.pdf (767.86 KB) |
September, 2015 |
Draft: Identity and Access Management for Electric Utilities NIST SP 1800-2 Practice Guide |
Executive Summary (241.98 KB)
Approach, Architecture, and Security Characteristics (4.67 MB)
How-To Guides (10.46 MB)
All Volumes (7.75 MB)
es-idam-nist-sp1800-2-draft.zip (14.13 MB) |
August, 2015 |
Draft: Securing Electronic Health Records on Mobile Devices NIST SP 1800-1 Practice Guide |
Executive Summary (269.15 KB)
Approach, Architecture, and Security Characteristics (641.18 KB)
How-To Guides (4.03 MB)
Standards and Controls Mapping (505.41 KB)
Risk Assessment and Outcomes (1.35 MB)
All Volumes (5.41 MB)
hit-ehr-nist-sp1800-1-draft.zip (5.1 MB) |
July, 2015 |
Draft: Derived PIV Credentials Project Description |
derived-piv-project-description-draft.pdf (304.32 KB) |
June, 2015 |
Draft: DNS-Based Secured Email Project Description |
dns-secure-email-project-description-draft.pdf (402.91 KB) |
June, 2015 |
Final: Attribute Based Access Control Project Description |
abac-project-description-final.pdf (1.04 MB) |
April, 2015 |
Draft: Wireless Medical Infusion Pumps Project Description |
hit-infusion-pump-project-description-draft.pdf (537.3 KB) |
December, 2014 |